Juneau Loop Road Projects
Project No. 0966030/SFHWY00403; 0966031/SFHWY00532

Project No. 0966030/SFHWY00403; 0966031/SFHWY00532

This project will resurface Mendenhall Loop Road between the Haloff Way/Stephen Richards Memorial Drive roundabout and the Mendenhall Boulevard/Valley Boulevard intersection, and construct a new roundabout at the intersection of Mendenhall Loop Road, Mendenhall Boulevard, and Valley Boulevard.
These projects include paving, roundabout construction, utility relocation and improvements, drainage, curb and gutter, and sidewalk.
Access to businesses near the work zone will not be affected.
Residents and travelers should expect altered traffic flows, construction noise within reason, and construction equipment and trucks moving through the area to the work zone.
Construction on the JNU Loop Road Projects began July 22, 2026, and will continue through September 30, 2026.
Activities and schedule are weather dependent and will include paving, roundabout construction, utility relocation and improvements, drainage, curb and gutter, and sidewalk.
Traffic control will include detours for vehicular, pedestrian, and bicycle traffic and flagging. Typical traffic flows through Mendenhall Loop Road will be maintained as much as possible with adequate detour routes for impacted side streets.
Business access near the work zone will not be affected.
Residents and travelers should expect altered traffic flows, construction noise within reason, and construction equipment and trucks moving through the area to the work zone.
Crews will be closely monitoring glacial flooding and phasing work appropriately.